A Ellery company - serving West Hollywood, CA
Ellery ADU Studio West Hollywood adu team

ADU Design & Permitting in Burbank - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Burbank, CA

Junior ADU and interior conversion in Burbank typically runs $85,000-$165,000 all-in, while site prep and utility work adds $15,000-$45,000 depending on what the existing 1940s-1960s stock requires. We’re Ellery ADU Studio, and we’ve found Burbank’s post-war wood-frame homes on 6,000-7,000 sq ft lots create a predictable conversion path - until you hit the BWP utility queue or a Magnolia Park foundation that hasn’t been touched in ninety years. Call (213) 329-7167 and we’ll walk your property with a written price before any work starts, per Haven Standard Clause 1.

Call (213) 329-7167

Why Burbank Homes Are Different

Burbank sits in the eastern San Fernando Valley where summer temperatures regularly top 100°F, so mechanical cooling isn’t optional in any new ADU - it’s a code and comfort reality. The proximity to the Verdugo Mountains puts portions of north and east Burbank in moderate-to-high fire hazard severity zones, which governs siting distances, ember-resistant venting, and exterior cladding choices under current California building code.

The housing stock tells its own story. Most lots hold 1940s-1960s post-war wood-frame stucco homes with detached two-car garages in the rear - the standard conversion target. But Magnolia Park’s 1920s-1940s Craftsman bungalows on smaller lots with mature trees and aging foundations demand extra pre-construction evaluation before design work begins. And Burbank is the only Valley city where we’re as likely to be designing a sound-isolated editing suite or writer’s room as a rental unit - Warner Bros., Disney, and dozens of production companies headquartered here mean entertainment-industry homeowners need professional-grade workspaces with acoustic treatments and high-amperage dedicated circuits that simply aren’t the default in adjacent Glendale or Studio City.

Then there’s BWP. Unlike surrounding Valley cities served by LADWP or SoCal Edison, Burbank runs its own municipal utility - Burbank Water and Power - so every electrical upgrade, sub-panel addition, and new utility meter runs through BWP’s separate fee schedule, capacity review, and inspection queue. Contractors who routinely work across LA County consistently underestimate timelines and utility connection costs on their first Burbank ADU job.

Our Main Burbank Services

Most Burbank homeowners start with one of these three services. Each has its own detailed page if you want deeper pricing and scope.

ADU Design & Permitting in Burbank

We produce the full permit set - architectural drawings, structural calculations, Title 24 energy compliance, and Burbank Planning & Building submission - as the core product, not an afterthought. For Burbank’s 1940s-1960s stock, we verify original foundation type and roof framing early, since both appear in every Burbank plan check. ADU Design & Permitting in Burbank

ADU Design & Permitting in Burbank

Garage Conversion ADU in Burbank

The detached two-car garage behind most Burbank homes is the fastest path to rentable square footage, but slab thickness, ceiling height, and BWP electrical capacity determine whether the existing structure converts or needs partial rebuild. We measure all three before design starts. Garage Conversion ADU in Burbank

Garage Conversion ADU in Burbank

New Detached ADU in Burbank

When the existing garage won’t convert or when you want a standalone unit, new detached ADUs in Burbank face fire-hazard zone setbacks, BWP trenching for electrical service, and the city’s design-review process for certain lot configurations. We coordinate all three in a single contract. New Detached ADU in Burbank

New Detached ADU in Burbank
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (213) 329-7167

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.
BeforeBefore
AfterAfter

Junior ADU & Interior Conversion in Burbank

Contractor applying spray foam insulation for garage conversion ADU project
Junior ADU & Interior Conversion in Burbank

Junior ADU and interior conversion in Burbank solves the problem of adding rentable square footage without touching the rear yard or waiting through a full detached ADU permit cycle. For the 1940s-1960s homes that dominate Burbank’s R-1 lots, this often means converting underused interior space - a basement, an attached room, or a section of the main house - into a self-contained unit with its own kitchen and exterior door. The entertainment-industry demand profile here also pushes many conversions toward professional workspace: sound-isolated editing suites, writer’s rooms, and voice-over booths that need acoustic treatment and dedicated circuits beyond standard residential specs. We handle the design, permit set, and construction under one contract with one written price. Junior ADU & Interior Conversion

Room-to-ADU Conversion

Signs you need it

You have a 250-400 sq ft attached room - former den, unused bedroom, or converted porch - with direct exterior access potential and a main panel that can accept a sub-feed.

What it costs in Burbank

Room-to-ADU conversion in Burbank typically runs $85,000-$140,000 all-in, including the permit set, fire-rated separation, mini-split installation for 100°F summers, and BWP electrical coordination.

How we do it

We verify existing framing and insulation, design the fire-rated separation wall per Burbank Building code, run BWP load calculations for the added electrical demand, and build to the permitted drawings with a documented photo record on every visit.

Interior JADU

Signs you need it

You want the fastest permit path under state law: a Junior ADU up to 500 sq ft inside your existing footprint, sharing bathroom and mechanical systems with the main house.

What it costs in Burbank

Interior JADU in Burbank typically runs $65,000-$95,000 all-in, with savings from shared systems offset by BWP electrical upgrade costs and the acoustic treatments many Burbank clients request.

How we do it

We identify the optimal interior zone for separation, design the efficient kitchenette and exterior door placement, produce the JADU-specific permit set for Burbank’s expedited review, and build with the 365-Day Done Right Promise in writing.

What Junior ADU & Interior Conversion Costs in Burbank

Item Typical range in Burbank
Room-to-ADU conversion (all-in) $85,000 - $140,000
Interior JADU (all-in) $65,000 - $95,000
Acoustic/sound-isolation upgrade (entertainment workspace) $8,000 - $18,000

Can a Junior ADU share a bathroom with the main house?

Yes, under California state law a JADU up to 500 sq ft may share bathroom and mechanical systems with the main residence, which reduces both construction cost and permit complexity compared to a full ADU. Call (213) 329-7167 for an exact quote - estimates are free.

Do Burbank’s fire hazard zones affect interior conversions?

Interior JADUs and room conversions are generally exempt from exterior fire-hazard setback rules, but if your project adds any new exterior door, window, or modifies egress paths, ember-resistant venting requirements may apply to the new opening - we verify this in the permit set before construction starts.

ADU Site Prep & Utilities in Burbank

Architect working on professional ADU home design and floor plan drafting
ADU Site Prep & Utilities in Burbank

ADU site prep and utilities in Burbank means dealing with 1940s-1960s infrastructure that was never sized for a second dwelling: undersized electrical panels, clay sewer laterals, and gas lines that terminate at the main house. The BWP factor - Burbank’s independent municipal utility - adds a coordination layer that LA County contractors often miss on their first job here, with separate fee schedules, capacity reviews, and inspection queues that can extend timelines by weeks if not planned from the permit set forward. We handle BWP submission, trenching, and final hookup as part of our single-contract scope. ADU Site Prep & Utilities

Electrical Panel Upgrade

Signs you need it

Your main panel is 100 amps or less, or the label shows no spare breaker spaces for an ADU sub-panel feed.

What it costs in Burbank

Electrical panel upgrade in Burbank typically runs $4,500-$8,500 including BWP permit, new 200-amp service equipment, and coordination with BWP’s inspection queue.

How we do it

We verify BWP’s available transformer capacity for your address, specify the new panel and grounding system, pull the BWP permit, and schedule BWP inspection before rough-in.

Plumbing Lateral

Signs you need it

Your home has original clay or cast-iron sewer lateral from the 1950s-1960s, or the city record shows no separate cleanout for a rear ADU connection.

What it costs in Burbank

Plumbing lateral replacement or extension in Burbank typically runs $6,000-$14,000 depending on trench length, pavement restoration, and whether Burbank Public Works requires traffic control for street crossing.

How we do it

We camera the existing line, design the new lateral route to the ADU location, coordinate Burbank Public Works for any street cut, and pressure-test before backfill with documented photo record.

What ADU Site Prep & Utilities Costs in Burbank

Item Typical range in Burbank
Electrical panel upgrade (200-amp, BWP coordinated) $4,500 - $8,500
Plumbing lateral replacement/extension $6,000 - $14,000
Site grading and compacted base (new detached ADU pad) $5,000 - $12,000

Does BWP require a separate meter for an ADU?

BWP generally allows a sub-meter arrangement for ADUs under 750 sq ft, but requires a separate service lateral and meter for larger units or when the main panel cannot accommodate the calculated load - we determine this during permit set production and include the finding in your written quote.

How long does BWP take to approve an electrical upgrade?

BWP’s capacity review and electrical permit approval typically takes 2-4 weeks, which we build into the project schedule from the start - never as a surprise delay after construction begins. Call (213) 329-7167 to discuss your specific timeline.

Get the price in writing before anything starts.Serving Burbank - a real person answers, day or night.
Call now

Brands We Service in Burbank

We specify and coordinate prefab and modular systems from Tuff Shed, James Hardie, Abodu, and Cover within our single-contract model, with parts and sub-assemblies stocked through Los Angeles-area distributors for predictable turnaround. See our brands for full compatibility details.

Pricing for ADU in Burbank, CA

Two professionals working on ADU design and permitting with architectural blueprints
Pricing for ADU in Burbank, CA
Service Typical range in Burbank
Room-to-ADU conversion $85,000 - $140,000
Interior JADU $65,000 - $95,000
Acoustic/sound-isolation upgrade $8,000 - $18,000
Electrical panel upgrade (BWP) $4,500 - $8,500
Plumbing lateral replacement/extension $6,000 - $14,000
Site grading and compacted base $5,000 - $12,000
Foundation & grading (complex sites) $8,000 - $18,000
Gas line extension $3,500 - $7,500

What pushes price up in Burbank: BWP electrical coordination fees, fire-hazard zone ember-resistant detailing, Magnolia Park foundation remediation, and entertainment-industry acoustic or high-amperage specifications. Every project is quoted with a written price before any work begins, per Haven Standard Clause 1 - no exceptions, no change orders without written amendment.

Neighborhoods We Serve in Burbank

We work across Burbank’s full R-1 zone, from the post-war subdivisions near Victory Boulevard to the hillside lots below the Verdugo Mountains. Crews dispatch from our Los Angeles office with scheduling coordinated for Burbank permit and inspection windows.

  • Magnolia Park
  • Media District
  • Rancho Adjacent
  • Burbank Hills
  • Chandler Park

Service Area - Cities Near Burbank

Professionals reviewing ADU design plans and permitting documents at a desk
Service Area - Cities Near Burbank

Our crews serve the full eastern San Fernando Valley and adjacent foothill communities. If you’re comparing ADU options across city boundaries, we also work in Glendale, CA, North Hollywood, CA, Studio City, CA, and Van Nuys, CA - each with its own utility coordination, permit timeline, and price profile.

Serving Burbank, CA - Our Local Coverage Area

We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Burbank

Contractors installing metal framing for garage conversion ADU
FAQs About ADU in Burbank

Ready to get started? Free estimates · Written quotes before work starts response in Burbank
Call (213) 329-7167

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burbank Customers Say

★★★★★ 5.0 from 3+ reviews

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

How It Works in Burbank

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Burbank - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Burbank - we'll get back to you fast. No obligation.

When you send us your details, you confirm you have read our Privacy Policy and agree to be contacted by call, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Us
Call Now - Fast Dispatch
Local Service Coverage
Call Now - Fast Dispatch