A Ellery company - serving West Hollywood, CA
New Detached ADU in Sherman Oaks, CA | Ellery ADU Studio West Hollywood

New Detached ADU in Sherman Oaks - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

14+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Sherman Oaks

A new detached ADU in Sherman Oaks typically runs $220,000-$380,000 all-in, from permit set through final inspection, and every quote we release includes a whole-parcel seismic assessment before we name a number. We’re Ellery ADU Studio, and we’ve designed, permitted, and built ADUs across the San Fernando Valley since 2015 - including dozens of detached units on the flat Valley-floor lots that dominate Sherman Oaks. Our New Detached ADU in Sherman Oaks team coordinates dispatch from our Los Angeles office, with crews who know the difference between an LADBS structural review that passes clean and one that gets held up by unretrofitted garage framing.

Call (213) 329-7167

Call (213) 329-7167 to schedule your free estimate. We’ll pull LADBS records on your parcel before we draft, so the price you receive accounts for what is actually there.

Why Ellery ADU Studio West Hollywood Is Sherman Oaks’s Preferred New Detached ADU Company

We’ve completed new detached ADUs on parcels from Milbank Street to the Van Nuys border, and our Sherman Oaks clients receive the same single-contract design-build model we apply everywhere: drawings, permit set, and construction under one written price, with no designer-versus-builder blame gap when something needs adjustment.

Our reviews from Sherman Oaks homeowners consistently note two things: the documented photo record we deliver after every site visit, and the fact that our written price - established under Haven Standard Clause 1 - did not change once work started. We’re not guessing at your foundation condition or your panel capacity. We verify before we quote.

Response time to Sherman Oaks is same-day for initial calls; a live person answers 24/7, and we typically schedule site assessments within 48 hours. Crews are background-checked, uniformed, and licensed, with license numbers on every page of our documentation.

Local expertise matters here because Sherman Oaks permitting runs through LADBS, and LADBS structural review for any new detached ADU triggers a whole-parcel seismic look. Most owners assume their property was retrofitted after 1994. The paperwork on file usually covers the main house only. We know to check this before we price.

Our New Detached ADU Services in Sherman Oaks

Workers installing steel structural framing for a new detached ADU project
Our New Detached ADU Services in Sherman Oaks

Custom Built ADU

Custom built ADUs in Sherman Oaks start around $280,000 and run to $380,000 or more depending on square footage, finish level, and site conditions. Every custom project begins with a whole-parcel seismic assessment - we pull LADBS records, walk the existing structures, and scope any cripple-wall or anchor-bolt work before the design moves past schematic. On a 1950s ranch parcel off Milbank Street in Sherman Oaks, we pulled LADBS records before drafting and found the main house had a post-1994 retrofit on file but the detached stucco garage had never been touched - unbolted mudsills and unbraced cripple walls that the structural reviewer flagged the moment our new detached ADU triggered a whole-parcel review. We scoped cripple-wall plywood sheathing and anchor bolts on the garage as a concurrent line item, upsized the 100-amp panel to carry a ducted mini-split sized for 108°F Valley afternoons, and added an ERV with MERV-13 filtration for wildfire-smoke season; we now build a whole-parcel seismic assessment into every Sherman Oaks quote before we release a number.

Custom Built ADU

Prefab ADU Installation

Prefab ADU installation in Sherman Oaks typically ranges $220,000-$320,000, including transport, crane set, foundation, utility tie-ins, and LADBS permit coordination. We specify and coordinate prefab systems from Abodu, Cover, and Mighty Buildings - each with different transport dimensions that affect equipment access planning on 6,000-9,000 sq ft parcels. A flat Valley-floor lot does not mean automatic crane access; we survey gate widths, overhead lines, and staging area before quoting. The Haven Standard Clause 1 written price covers the full scope: prefab unit, foundation engineered for your soils report, panel upgrade if needed, and the ducted mini-split or ERV we specify for Valley heat and wildfire smoke. No post-delivery upsells.

Prefab ADU Installation

Modular ADU

Modular ADUs in Sherman Oaks follow a similar price band to prefab - $230,000-$330,000 - with the added coordination of factory inspections and transport permits for oversized modules. We work with Dvele and Plant Prefab on modular systems, and our single-contract model means we handle factory liaison, LADBS plan check, and site assembly as one scope. Modular units often arrive with HVAC pre-installed; we verify that the factory spec handles 100-108°F Sherman Oaks afternoons, not coastal assumptions. If it doesn’t, we resize before the module ships.

Modular ADU

Studio ADU and 1-Bed & 2-Bed ADU

Studio ADUs in Sherman Oaks run $220,000-$280,000; 1-bed units $260,000-$340,000; 2-bed units $300,000-$380,000. These ranges assume standard finish levels and include the seismic assessment, panel upgrade, and HVAC sizing as mandatory line items - not upgrades. A 2-bed detached ADU on a Sherman Oaks lot will trigger LADBS occupancy requirements that include egress windows, fire separation, and often a 200-amp service upgrade from the original 60-100 amp panel. We identify these requirements in the first site visit, not at permit submittal.

Studio ADU and 1-Bed & 2-Bed ADU
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (213) 329-7167

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.
BeforeBefore
AfterAfter

Trusted Brands We Service in Sherman Oaks

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie - not as a catalog to browse, but as systems we engineer into your single contract. For Sherman Oaks clients, this means we stock local knowledge of which factory lead times align with LADBS plan-check cycles, which transport dimensions clear Ventura Boulevard corridor routes, and which foundation systems suit the Valley’s alluvial soils. A Mighty Buildings unit with its polymer-composite panels performs differently in 108°F heat than an Abodu unit with its steel-frame envelope; we specify accordingly. The brand is a tool. The specification is our responsibility.

Common New Detached ADU Problems We See in Sherman Oaks Homes

Contractors installing front door on a new white detached accessory dwelling unit
Common New Detached ADU Problems We See in Sherman Oaks Homes
  • Unretrofitted detached garages triggering scope changes mid-permit. LADBS records show seismic work on the main house only. The detached garage - your ADU’s neighbor on the parcel - still has unbolted mudsills and unbraced cripple walls. We find this before we quote. Most competitors don’t look until the structural reviewer does.
  • HVAC sized on coastal assumptions. Sherman Oaks runs 15-20°F hotter than Santa Monica. A mini-split spec’d for 85°F design temperature fails the first July heat event. We size every system for 108°F, with ERV and MERV-13 filtration for wildfire-smoke season.
  • Undersized electrical panels. Original 1950s-1970s construction in Sherman Oaks typically includes 60-100 amp service. A new detached ADU with electric heat, cooking, and laundry often requires 200-amp upgrade. We scope this as a mandatory line item, not a surprise.
  • Drainage and access assumptions on flat lots. A 6,000 sq ft parcel with a detached garage still needs pad elevation, drainage routing away from both structures, and equipment access planning before a prefab or modular set can be staged. Flat does not mean ready.
Get the price in writing before anything starts.Serving Sherman Oaks - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Sherman Oaks, CA

Service Typical Range (Sherman Oaks)
Studio ADU (custom or prefab) $220,000 - $280,000
1-Bed ADU (custom or prefab) $260,000 - $340,000
2-Bed ADU (custom or prefab) $300,000 - $380,000
Whole-parcel seismic assessment $1,200 - $2,500 (included in quote)
Cripple-wall retrofit / anchor bolts (if needed) $4,000 - $10,000
Electrical panel upgrade (100A to 200A) $3,500 - $7,000
Ducted mini-split or ERV with MERV-13 $8,000 - $15,000 (mandatory, not upgrade)

These ranges reflect Sherman Oaks’s LADBS permit fees, Valley labor rates, and the seismic and HVAC realities of this specific market. Every project receives a written price before any work starts - Haven Standard Clause 1 - and that price includes the whole-parcel seismic assessment, not a separate discovery phase. Call (213) 329-7167 for your exact quote; estimates are free, and we offer a Free Second Opinion on any written estimate already in hand.

We Also Serve Cities Near Sherman Oaks

Architect working on professional ADU home design and floor plan drafting
We Also Serve Cities Near Sherman Oaks

Our New Detached ADU crews work across the Valley, including Van Nuys, Studio City, Tarzana, and North Hollywood. Each city carries its own LADBS or LA County permitting path, its own seismic history, and its own HVAC sizing assumptions. We adjust the scope accordingly before releasing a written price.

Serving Sherman Oaks, CA - Our Local Coverage Area

We’re based in the Sherman Oaks area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Sherman Oaks

Construction workers installing a prefabricated wall panel for a new detached ADU
FAQs - New Detached ADU in Sherman Oaks

Why Sherman Oaks Chooses Ellery ADU Studio West Hollywood

We set the standard for new detached adu in Sherman Oaks.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sherman Oaks

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Sherman Oaks - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local new detached adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sherman Oaks Customers Say

Trusted by homeowners across Sherman Oaks and surrounding areas.

★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer

Ready for New Detached ADU in Sherman Oaks?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Sherman Oaks.

(213) 329-7167

Request a Free Estimate in Sherman Oaks

Tell us about your new detached adu needs - we'll respond within the hour.

When you send us your details, you confirm you have read our Privacy Policy and agree to be contacted by call, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Us
Local Service Coverage
Call Now - Fast Dispatch