A Ellery company - serving West Hollywood, CA

Dvele Junior ADU & Interior Conversion Nationwide

Dvele Junior ADU & Interior Conversion in West Hollywood: What to Know First

We provide independent Dvele junior ADU and interior conversion work in West Hollywood as an independent Dvele service provider, with most projects moving from signed contract to permit submission in 8-12 weeks and construction following a single written price established before any work begins. A typical basement ADU or room-to-ADU conversion using Dvele’s prefab panel system runs $185,000-$340,000 all-in, drawings through final inspection, with the exact figure locked in writing under Haven Standard Clause 1. This page is for West Hollywood homeowners who bought a Dvele-equipped property between 2019 and 2024 and now need to adapt that interior system to a legal junior ADU - or who are comparing Dvele against Abodu and Cover for an interior conversion and want the actual documentation and price structure they’ll receive. Call (213) 329-7167 to schedule your free estimate.

Call (213) 329-7167

How Dvele Products Fail - and How We Fix Them

  • Dvele S2 Series panel delamination in below-grade installs. The S2’s magnesium oxide sheathing absorbs moisture when the vapor barrier is compromised during a basement ADU conversion, causing edge swelling that throws off interior finish tolerances by 1/8 inch or more. We map the affected panels with thermal imaging, replace only the compromised sections with OEM-grade MGO from Dvele’s supplier network, and reinstall the vapor barrier to ASTM E1745 Class A before closing walls.
  • Dvele S3 Smart Home hub failure after electrical service upgrades. The S3’s centralized Loxone hub doesn’t always handshake cleanly with the 200-amp panels common in West Hollywood’s 1920s duplexes after a room-to-ADU conversion adds a subpanel. We isolate the hub on its own circuit, reprogram the topology for split-phase service, and document the new electrical single-line in the permit set so the city inspector sees exactly what changed.
  • Dvele One Series HVAC integration gaps in attached addition ADUs. The One Series ships with a Mitsubishi ductless spec that assumes open-plan airflow; when we partition a West Hollywood bungalow into a junior ADU with separate bedroom and living zones, the original cassettes short-cycle. We resize the load calculation per ACCA Manual J, specify additional cassettes or a slim-ducted unit, and coordinate the change order through Dvele’s parts desk before rough-in.
  • Dvele window wall misalignment in hillside settle. The Laurel Canyon-adjacent parcels in West Hollywood see seasonal soil movement that shifts the modular window walls in Dvele’s above-garage configurations, breaking the silicone seal and creating water intrusion at the header. We jack and shim to level, replace the compression gasket with a wider-profile OEM part, and reflash with copper panning that accommodates 3/4 inch of future movement.
  • Dvele S2 electrical chase obstruction during interior JADU partitioning. The S2’s prefab chases run at 16-inch centers that conflict with new partition walls in a typical West Hollywood 1-bedroom-to-JADU conversion, forcing exposed conduit or drywall teardown. We reroute through the floor cavity where structurally feasible, or specify surface-mounted mini-chase with matching finish - both paths documented in the revised permit set so the inspector follows our logic.

Our Dvele Junior ADU & Interior Conversion Process

Contractor applying spray foam insulation for garage conversion ADU project
Our Dvele Junior ADU & Interior Conversion Process
  1. 1
    Site survey and Dvele serial verification. We record the unit’s production batch, firmware version, and any prior service tags - this determines parts availability and warranty status before we quote.
  2. 2
    Conditioned-space diagnostics. Moisture meters, thermal imaging, and laser level survey of the existing Dvele envelope; we photograph every reading and send the file within 24 hours.
  3. 3
    Permit-set revision or creation. For conversions where Dvele’s original drawings don’t match as-built conditions - common in West Hollywood’s informal garage conversions from the 1980s - we produce a new permit set that bridges the gap.
  4. 4
    Written price presentation. Every line item is itemized: Dvele OEM parts, compatible aftermarket where OEM is back-ordered, labor, permit fees, and contingency. The total is fixed at signing per Haven Standard Clause 1.
  5. 5
    Construction with documented milestones. Our crews upload dated photos at rough-in, insulation, and final; you see the Dvele panels, the new partitions, and the test results without visiting the site.
  6. 6
    Final inspection and 365-Day Done Right Promise activation. The warranty document references the specific permit number, the Dvele batch code, and the exact scope as permitted - not a generic description.
BeforeBefore
AfterAfter

What Dvele Junior ADU & Interior Conversion Costs in West Hollywood

Scenario Typical Range What Moves the Price
Room-to-ADU conversion, Dvele S2 or S3, no structural change $185,000-$245,000 Electrical service upgrade, separate meter requirement, kitchen/bath finish level
Basement ADU with Dvele panel remediation $220,000-$340,000 Depth of MGO replacement, drainage correction, egress window cut
Above-garage ADU, Dvele One Series, hillside settle repair $265,000-$380,000 Foundation augmentation, window wall replacement, seismic bracing
Attached addition ADU with Dvele HVAC reconfiguration $240,000-$310,000 Additional cassettes, ducted unit upgrade, load calc complexity

These ranges include design, permit set, Dvele-specific parts, labor, and final inspection. What they don’t include: your separate meter application to LADWP, which runs $3,500-$8,000 depending on transformer proximity, or soil testing in the hills above Sunset. We itemize those in writing before you sign. Call (213) 329-7167 for an exact quote - estimates are free.

Why West Hollywood Homeowners Call Ellery ADU Studio West Hollywood for Dvele Work

Architect working on professional ADU home design and floor plan drafting
Why West Hollywood Homeowners Call Ellery ADU Studio West Hollywood for Dvele Work

We’ve specified and coordinated Dvele, Abodu, and Cover systems since 2015, and the difference shows up in the permit set - ours include the Dvele batch code, the revised electrical single-line, and the vapor barrier detail the inspector actually wants to see, not a generic note that sends you back for corrections. Nadia Ellery grew up watching her father argue with contractors over permit drawings that never matched the wall; she built Ellery ADU Studio so that argument doesn’t happen on our sites. The 365-Day Done Right Promise is in writing before the first panel is touched. A live person answers (213) 329-7167 at any hour, and if you already have a written estimate from another firm, we’ll give you a free second opinion with no obligation to hire. The document is the promise. Everything else is a conversation.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need ADU help in West Hollywood? Licensed & insured · Written quotes before work starts response · free estimates
Call (213) 329-7167
Local Service Coverage

Request a Free Estimate in West Hollywood

Tell us what you need - Ellery ADU Studio West Hollywood responds fast. No obligation.

When you send us your details, you confirm you have read our Privacy Policy and agree to be contacted by call, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Us
Call Now - Fast Dispatch