We provide independent Cover junior ADU and interior conversion service in West Hollywood, typically completing diagnostic-to-permit-ready drawings in 4-6 weeks for interior conversions and 8-12 weeks for attached-addition JADUs involving Cover wall systems. Every project receives a written cost range before we produce a single drawing, per Haven Standard Clause 1. This page is for West Hollywood homeowners who already own a Cover product - a Backyard Studio, Accessory Dwelling Unit, or Cover Pod - and need to convert existing interior space or add a junior ADU that integrates with Cover’s panelized wall system. Call (213) 329-7167 to schedule your free estimate, or bring us any written estimate for a free second opinion.
How Cover Products Fail - and How We Fix Them
Cover’s steel-frame, panelized construction performs differently in West Hollywood’s climate than in the Pacific Northwest where the system was developed. We’ve diagnosed enough Cover installations across the Hollywood Hills and flatland parcels to know where the gaps show up.
- Cover Backyard Studio: thermal bridging at panel joints in summer heat. The steel studs conduct heat directly through the wall assembly; in West Hollywood’s 90°F+ September days, interior surface temperatures on the studio’s north wall can run 8-12 degrees hotter than ambient. We specify a continuous exterior insulation layer - mineral wool or rigid foam - and detail the vapor barrier to California Title 24 standards, not the original Pacific Northwest spec. The fix is in the permit set, not a band-aid.
- Cover ADU (full-size): moisture accumulation in the floor cavity on hillside lots. We’ve found this repeatedly on Laurel Canyon-adjacent properties where the grade slopes toward the foundation. The factory-sealed belly pan traps condensation against the steel chassis. Our fix: we cut inspection ports, document the condition with photos (you get the file), and redesign the crawlspace ventilation as part of the conversion scope. Sometimes the subfloor needs replacement; we price that as a line item before we start, not after we open it.
- Cover Pod: electrical chase compression during interior conversion. When homeowners try to add a kitchenette or bathroom to an existing Pod, the original electrical runs - packed tight in the 2-inch steel stud cavity - overheat under new load. We map the existing circuits with a thermal camera, then specify a surface-mounted conduit system or a dedicated subpanel, depending on your service size. The permit set shows both options with real amperage calculations.
- Window-wall units: sealant degradation from UV exposure. Cover’s factory-applied EPDM gaskets around the fixed glass panels degrade faster in West Hollywood’s sun than the 20-year rating suggests - we typically see cracking at year 7-9, not 15. During a JADU conversion that ties into an existing Cover structure, we replace these gaskets with silicone-compatible backup rods and Dow 795 sealant, detailed in the permit set so the inspector can verify.
- Panel connection hardware: galvanic corrosion at dissimilar metal contact points. The zinc-coated clip system Cover uses can react with the aluminum flashing common in California roof tie-ins. We’ve found this on three West Hollywood conversions where the original installer didn’t isolate the metals. Our fix: we specify neoprene isolation washers and document the assembly in the structural details, so the connection lasts past the first rainy season.
Our Cover Junior ADU & Interior Conversion Process

- 1
Site visit and Cover-specific diagnostic. We arrive with Cover’s original panel schedule (we maintain a library), thermal camera, and moisture meter. You receive a documented photo record of every finding before we leave.
- 2
Feasibility and zoning check. We verify your West Hollywood parcel against the current JADU ordinance - lot coverage, parking relief, and whether your Cover structure counts toward floor area. We name the specific code section, not “we’ll check with the city.”
- 3
Written price before drawings. Under Haven Standard Clause 1, you get a line-item cost range: design and permitting, structural modifications, utility extensions, and finish. No range is wider than 15%. The document is the promise. Everything else is a conversation.
- 4
Permit set production. Our drafters produce Title 24-compliant drawings that integrate Cover’s panel dimensions with your existing structure. The set includes structural calcs, MEP plans, and the energy compliance forms West Hollywood Building & Safety requires.
- 5
Construction and inspection coordination. Our crews are background-checked and uniformed; the license number appears on every page of your contract. We pull permits, schedule inspections, and pass them. The 365-Day Done Right Promise begins at final.
- 6
Closeout documentation. You receive the as-built drawings, photo record, warranty document, and a single-page maintenance schedule for the Cover components we modified.
Before
AfterWhat Cover Junior ADU & Interior Conversion Costs in West Hollywood
These ranges reflect our actual West Hollywood projects from 2023-2025, all with written prices fixed before work began.
| Project Type | Typical Range | What Moves the Price |
|---|---|---|
| Room-to-JADU conversion (existing Cover ADU interior reconfiguration) | $85,000-$140,000 | Adding kitchenette with gas; bathroom stack location; Title 24 triggers |
| Basement ADU with Cover panel integration (tie-in to existing structure) | $120,000-$195,000 | Excavation for headroom; seismic retrofit; separate meter |
| Above-garage ADU using Cover wall system | $155,000-$240,000 | Garage structural capacity; fire separation; stair access |
| Attached addition ADU (new Cover panels + existing structure) | $175,000-$280,000 | Foundation type; utility trench length; roof tie-in complexity |
West Hollywood’s hillside parcels - particularly north of Sunset - add 10-20% for access and grading. Flatland lots east of La Cienega typically run at the lower end. Every range above includes design, permitting, construction, and final inspection. Call (213) 329-7167 for an exact quote; estimates are free.
Why West Hollywood Homeowners Call Ellery ADU Studio West Hollywood for Cover Work

We’re not a general contractor who learned Cover last month. Since 2015, we’ve designed, permitted, and built 900+ ADUs across Los Angeles County, including dozens of Cover-integrated projects in West Hollywood specifically. Nadia Ellery grew up in Santa Monica watching her father argue with contractors over permit drawings that never matched the finished wall; she built Ellery ADU Studio to eliminate that gap entirely. Our design-build model means the person who draws your permit set also manages the crew who builds it - no designer-builder finger-pointing. We also specify Abodu and Dvele systems when Cover isn’t the right fit, so the recommendation is based on your site, not our inventory. A live person answers calls 24/7. The 365-Day Done Right Promise is in writing before we start. The license number is on every page.
FAQs
Cover’s warranty does not transfer to modified structures, and any structural alteration - including the interior conversions we perform - terminates the original coverage. As an independent Cover service provider, we document every modification with photos and as-built drawings so you have a clear record of what changed and when. Our 365-Day Done Right Promise covers our workmanship; we also identify any remaining Cover components that may still carry factory coverage and note their status in your closeout packet. Call (213) 329-7167 to discuss your specific structure.
We use OEM panel gaskets, connection hardware, and window-wall seals when Cover’s lead time is under four weeks; for longer waits, we specify functionally equivalent aftermarket parts from approved California suppliers, with the substitution noted in your permit set and warranty document. We do not use untested generic components on structural connections. The parts decision is documented in your written scope before work begins, not made at the job site.
We replace rather than repair when the steel frame shows section loss exceeding 15%, when floor cavity moisture has compromised structural subfloor, or when the electrical system cannot be brought to current code without exceeding 60% of replacement cost. During our diagnostic site visit, we measure, photograph, and name the specific condition that triggers each threshold. Most West Hollywood Cover structures we’ve evaluated are viable for conversion with targeted repairs. Call (213) 329-7167 to schedule the diagnostic.
Interior conversions (room-to-JADU within an existing structure) typically run 10-14 weeks after permit issuance; attached additions or above-garage units run 16-24 weeks. West Hollywood Building & Safety issues permits for JADUs in 6-10 weeks if the set is complete, which ours are. We do not promise same-day or same-week construction starts - this is planned work with a fixed price, not emergency service. The schedule is written into your contract under Haven Standard Clause 3.
Yes. We specify and coordinate prefab and modular systems from Abodu, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie under the same single-contract model. If your site conditions - setback, access, or utility capacity - make a Cover-integrated JADU impractical, we will tell you during the feasibility visit and present the alternative that fits. The recommendation is in writing, with a parallel cost range, before you commit to any design work.